top of page
PROJECTS
JANNEY RUN BOX CULVERT REHABILITATION
The A&W Coatings team stops infiltration of water mixed with industrial contaminants.
IRONDEQUOIT BAY PUMP STATION FORCE MAIN IMPROVEMENTS
A&W Coatings completes steel rehabilitation when abandoned by the previous lining applicator.
SECOND CREEK TRUNKLINE REHABILITATION
A&W Coatings saves Knoxville Utilities Board 157 million gallons of extraneous water to treat each year using Warren Environmental’s epoxy coating system.
SEWER SYSTEM REHABILITATION
CIPP solutions preserve delicate ocean ecology while saving the community time and money.
HYDROELECTRIC STATION PENSTOCK HEADWALL PIPE REHABILITATION
Warren’s environmentally-friendly epoxy system offers big benefits to hydroelectric station.
WATER STREET LIFT STATION #1 AND #2 REHABILITATION
Repeat client seeks A&W Coatings to stop active leaks and return lift stations to the original condition.
INTERCEPTOR RELOCATION AND EMERGENCY SIPHON CROWN REPAIR
A&W protects new manholes against long-term corrosion protection and provides structural repair to an emergency siphon pipe crown.
GOOSE CREEK INTERCEPTOR REHABILITATION
Warren’s quick cure 301-14 epoxy provides A&W Coatings with schedule flexibility to reduce the owner’s bypass pumping operation costs.
IP 54-INCH AND 21-INCH STEEL PIPE REHABILITATION
A&W’s single coat epoxy application maintains critical path schedule during paper mill shutdown.
bottom of page